Frequently Asked Questions

Construction steps for artificial turf

Construction steps for artificial turf

06/13/2025 FTG

1. Glue application: It is required to use a brush to evenly apply a thin and thick layer of glue at the bottom of the lawn. It is not allowed to repeatedly apply glue, otherwise it may cause foaming or even peeling. The thickness of the glue should be strictly controlled, and the glue application speed should be appropriate. Apply it to the two bonding surfaces that are being bonded separately. 

2. Adhesive: According to the temperature, humidity, and other conditions at that time, the drying time should be reasonably controlled. Generally, it is advisable to apply the adhesive for 10-15 minutes, and the adhesive should reach 80-90% dry and not stick by hand. When bonding, it is required to align and bond firmly at once. Never move the bonded object back after bonding. 

3. Pressure application: After bonding, remove any surface debris and use a specialized rubber mallet to press firmly from the bonding area to both sides, ensuring that the surface is fully bonded, compacted, and more secure. 

4. The curing time is generally three days, and the final strength test is usually ten days. Therefore, close attention should be paid to its maintenance during the curing period to avoid excessive exposure to sunlight, water intrusion, and movement, in order to achieve the best bonding state. 

5. Clean the cut fragments on the site before filling them with quartz sand and rubber particles after bonding.